Two rooms, two different answers. The bathroom needed everything: cracked tile, dated fixtures and whatever was behind the walls after sixty years. The kitchen did not. Its cabinets were in good shape, so a full gut would have spent money the client did not need to spend.

Both were priced at a fixed price, signed before demolition, with one point of contact from the first walkthrough to the final punch list.

LocationAdelphi St, Fort Greene, Brooklyn
HomeApartment
BathroomFull gut to the studs
KitchenRefresh, existing cabinets kept
ContractFixed price, signed before demo
FinishesSubway tile, chrome, white quartz

What Was Wrong

What We Did

Step 1

Demo to the studs

The bathroom was taken down to the framing, with the plumbing exposed and corrected.

Step 2

Waterproofing

New backer board and a waterproofing membrane around the tub before any tile went up.

Step 3

Tile and fixtures

White subway tile tub surround, a new tub, chrome valve and handheld shower, new toilet, vanity and a mirrored medicine cabinet.

Step 4

Kitchen refresh

Existing cabinets kept. New white quartz countertops, a clean subway tile backsplash, and a new sink and faucet.

Before and After

Before and after of a Fort Greene bathroom tub wall: cracked beige tile and an old tub on the left, white subway tile surround with chrome fixtures on the right
Tub wall. 1960s tile to white subway and chrome.
Before and after of a Fort Greene bathroom vanity: old vanity and beige tile on the left, new white vanity, toilet and mirrored medicine cabinet on the right
Vanity side. New vanity, toilet and medicine cabinet.
Before and after of a Fort Greene kitchen: dark granite counter and pressed-metal backsplash on the left, white quartz counter and subway tile backsplash with the same wood cabinets on the right
Kitchen. Same cabinets, new quartz, backsplash, sink.
Fort Greene bathroom gutted to the studs during demolition, with old plumbing exposed
Demo day. Down to the studs before anything new went in.

Related

Canaj Management is a Licensed NYC Contractor, DCWP Home Improvement Contractor #2134434, fully insured, based at 72-20 Forest Ave, Ste 1B, Ridgewood, NY 11385. We renovate bathrooms, kitchens and apartments across NYC, specializing in Brooklyn and Queens.

Call (718) 200-4898 or email [email protected].