Co-op & Condo Bathrooms · Queens, Brooklyn, Manhattan
The bathroom is the easy part. The board package, the insurance certificates, the licensed plumber, the super and the work-hour rules are what make a co-op job run on time or stall for a month. We handle all of it.
Canaj Management is a Licensed NYC Contractor (DCWP HIC #2134434) building bathrooms in co-op and condo apartments across Queens, Brooklyn and Manhattan. The construction is the same as any bathroom. Everything around it is not:
| Stage | Typical time |
|---|---|
| Walkthrough, scope and fixed-price proposal | 1 week |
| Fixture selections and alteration package to the building | 2–4 weeks |
| Construction, standard gut (layout kept) | 4–6 weeks |
| Construction, prewar gut or accessible conversion | 6–8 weeks |
| Building sign-off and deposit release | 1–2 weeks |
Prewar co-ops take longer to demolish. Old tile set in a thick mortar bed, metal lath and heavy plaster come out slowly, and once the walls are open the studs and subfloor usually need correcting. We price that honestly up front instead of discovering it as a change order.
These are typical ranges in Queens and Brooklyn. Manhattan buildings with higher insurance requirements, freight elevator scheduling or stricter hours run higher. Every job is priced from a walkthrough.
A prewar co-op apartment on E 7th St in Midwood, Brooklyn. The family wanted a bathroom an older parent could use safely. We took out the tub and built a curbed walk-in stand-up shower with ADA fixtures in brushed nickel throughout, working through the building’s alteration agreement with a licensed master plumber and electrician. See the full project →



Queens: Forest Hills, Rego Park, Jackson Heights, Sunnyside, Bayside, Fresh Meadows, Flushing, Astoria, Ridgewood.
Brooklyn: Brooklyn Heights, Park Slope, Flatbush and Midwood, Bay Ridge, Fort Greene, Clinton Hill.
Manhattan: Upper East Side, Upper West Side, Gramercy Park, Murray Hill, Chelsea, Greenwich Village.
Canaj Management · Licensed NYC Contractor, DCWP Home Improvement Contractor #2134434 · $2M per occurrence / $3M aggregate liability, workers’ comp and disability on file, bonded
72-20 Forest Ave, Ste 1B, Ridgewood, NY 11385 · (718) 200-4898 · [email protected]
Typically $15,000–$25,000 for a refresh that keeps the layout, $28,000–$42,000 for a full gut with the licensed plumber and electrician most boards require, and $32,000–$50,000+ for a prewar gut, accessible bathroom or layout change.
Almost always. Anything beyond paint or a like-for-like fixture swap normally needs an approved alteration agreement first. We prepare the contractor side of the package: scope, insurance certificates and trade licenses.
Two to four weeks of paperwork, then four to six weeks of construction for a standard gut, or six to eight weeks for a prewar or accessible conversion.
Yes. A NYC licensed master plumber and a licensed electrician are part of our base scope on co-op and condo jobs, not a later change order.
Yes. We issue certificates naming the co-op corporation or condo association and the managing agent as additional insureds, with workers’ compensation and disability on the state forms buildings accept.
Free Estimate · (718) 200-4898
We will read the requirements, walk the bathroom, and send a fixed-price proposal that already accounts for the building’s rules.