Two rooms, two different answers. The bathroom needed everything: cracked tile, dated fixtures and whatever was behind the walls after sixty years. The kitchen did not. Its cabinets were in good shape, so a full gut would have spent money the client did not need to spend.
Both were priced at a fixed price, signed before demolition, with one point of contact from the first walkthrough to the final punch list.
What Was Wrong
- 1960s bathroom. Cracked beige tile with a black border, an old tub and dated fixtures
- Tired vanity corner. Old vanity, sink and fixtures crowded into a small room
- Kitchen counters. Dark granite and a pressed-metal backsplash that made the small kitchen feel darker
What We Did
Demo to the studs
The bathroom was taken down to the framing, with the plumbing exposed and corrected.
Waterproofing
New backer board and a waterproofing membrane around the tub before any tile went up.
Tile and fixtures
White subway tile tub surround, a new tub, chrome valve and handheld shower, new toilet, vanity and a mirrored medicine cabinet.
Kitchen refresh
Existing cabinets kept. New white quartz countertops, a clean subway tile backsplash, and a new sink and faucet.
Before and After
Related
Canaj Management is a Licensed NYC Contractor, DCWP Home Improvement Contractor #2134434, fully insured, based at 72-20 Forest Ave, Ste 1B, Ridgewood, NY 11385. We renovate bathrooms, kitchens and apartments across NYC, specializing in Brooklyn and Queens.
Call (718) 200-4898 or email [email protected].